CSR Gyprock Wet Area Base Coat 15kg

    Description

    Gyprock Wet Area Base Coat is a moisture resistant base coat ideal for use as the first and second coat in a three coat plasterboard jointing system in wet areas.

    Product Overview

    Wet Area Base Coat is a pre-mixed, low VOC jointing compound with excellent tape adhesion to provide joint strength.

    Used for the first and second coat in a three coat jointing system, its moisture resistance makes it the perfect choice for joints in wet areas. 
     
    Joints may be finished with any Gyprock topping or all-purpose compound and sanded smooth prior to decoration. Where walls are to be tiled, no finish coat is required.

    Typical Applications

    Gyprock Wet Area Base Coat is typically used for the first and second coat in a three coat jointing system in residential and commercial walls and ceilings. It is ideal for joints in moisture resistant systems in bathrooms, wet areas and laundries. Wet Area Base Coat is designed for application with hand tools, mud boxes, automatic tapers and other machine tools.

    Product Options

    Gyprock Wet Area Base Coat is available in a 15kg bucket with a coverage of 30kg/100m2.

    It has a shelf life of 1 year from date of manufacture.

    Physical & Chemical Properties 

    Specific gravity (H20=1) 1.4 - 1-8
    VOC content (as specified by GBCA) 8g/L as VOC content per material

    CSR Gyprock Wet Area Base Coat 15kg

      Product form

      SKU: 10146

      $112.00 Incl. GST

      Gyprock Wet Area Base Coat is a moisture resistant base coat ideal for use as the first and second coat... Read more

        • Shipped today? Order within: Oct 19, 2026 17:00:00 +1100

          Delivery Instruction

        Where does Wall Ceiling deliver to?

        Wall Ceiling is delighted to offer plasterboard delivery to metro Sydney.

        For REGIONAL AREA, please email us at info@wallceiling.com.au with the items and quantities you need from our website, and we will promptly provide a manual quote.

        How much do you charge for delivery?

        Customer will receive an accurate delivery charge during checkout.

        How long does it take to deliver the order and how much it will cost?

        Delivery time frame varies by location:

         Location Delivery Time Frame
        Sydney 1 - 3 business days
        Central Coast 3 - 5 business days
        Wollongong 3 - 5 business days
        Bowral - Mittagong 3 - 5 business days 

        Some products may have a longer lead time which we will inform you as early as possible.

        Who is responsible for unloading the materials off the truck?

        Our delivery driver will assist to unload the materials next to the truck. However, it is the customer's responsibility to move the materials beyond that point.

        Do I need to be on-site to receive my delivery?

        Yes, if you are not available, please kindly arrange another person to accept and help with unloading on your behalf.

        Do you offer crane truck delivery?

        No, we found hand unload or forklift on site is the most effectively way to unload plasterboard products.

        What time will truck arrive during the delivery day?

        It's difficult to predict precise delivery time due to factors such as traffic and weather conditions.

        To facilitate a smooth delivery process:

        • Our office will schedule and confirm delivery date with you after receiving your order.
        • On the day of delivery, our driver will contact you before dispatching from warehouse to ensure you are prepared.

        Description

        Gyprock Wet Area Base Coat is a moisture resistant base coat ideal for use as the first and second coat in a three coat plasterboard jointing system in wet areas.

        Product Overview

        Wet Area Base Coat is a pre-mixed, low VOC jointing compound with excellent tape adhesion to provide joint strength.

        Used for the first and second coat in a three coat jointing system, its moisture resistance makes it the perfect choice for joints in wet areas. 
         
        Joints may be finished with any Gyprock topping or all-purpose compound and sanded smooth prior to decoration. Where walls are to be tiled, no finish coat is required.

        Typical Applications

        Gyprock Wet Area Base Coat is typically used for the first and second coat in a three coat jointing system in residential and commercial walls and ceilings. It is ideal for joints in moisture resistant systems in bathrooms, wet areas and laundries. Wet Area Base Coat is designed for application with hand tools, mud boxes, automatic tapers and other machine tools.

        Product Options

        Gyprock Wet Area Base Coat is available in a 15kg bucket with a coverage of 30kg/100m2.

        It has a shelf life of 1 year from date of manufacture.

        Physical & Chemical Properties 

        Specific gravity (H20=1) 1.4 - 1-8
        VOC content (as specified by GBCA) 8g/L as VOC content per material

        © 2026 Wall Ceiling,

          • American Express
          • Apple Pay
          • Mastercard
          • Visa

          Login

          Forgot your password?

          Don't have an account yet?
          Create account